Spider Lift
KAFD Tower Glass Replacement
Replacement of damaged curtain wall panels at 38m using a tracked spider lift on a podium deck.
43m Diesel Spider Lift

Projects
A selection of the facade, industrial, retail and infrastructure projects our spider lifts, manlifts and scissor lifts have supported in Riyadh, Jeddah and Dammam.
Riyadh Province
Recent access equipment scopes delivered from our Riyadh depot.
Spider Lift
Replacement of damaged curtain wall panels at 38m using a tracked spider lift on a podium deck.
43m Diesel Spider Lift
Spider Lift
Feature lighting installation over mud-brick heritage walls with zero ground damage.
21m Battery Spider Lift
Scissor Lift
Ceiling services and cladding installation across three station boxes.
12m Electric Scissor Lift
Manlift
Purlin and roof sheeting installation across a 40,000 sqm distribution centre.
26m Diesel Boom Lift
Manlift
Installation of illuminated corporate signage at 30m above a live plaza.
32m Diesel Boom Lift
Makkah Province
Recent access equipment scopes delivered from our Jeddah depot.
Spider Lift
Night-shift atrium cleaning and lighting replacement over polished stone flooring.
16m Electric Spider Manlift
Manlift
External repainting of a 12-storey seafront hotel with jib access over balconies.
43m Telescopic Boom Lift
Scissor Lift
Overhead lighting and fire system maintenance inside an MRO hangar.
14m Electric Scissor Lift
Eastern Province
Recent access equipment scopes delivered from our Dammam depot.
Spider Lift
Pipe rack insulation access during a 21-day turnaround with standby units on site.
30m Diesel Spider Lift
Manlift
Shell inspection and coating repair across six storage tanks.
32m Diesel Boom Lift
Scissor Lift
MEP first fix and ceiling grid installation for a multi-unit retail block.
10m Electric Scissor Lift
Spider Lift
Palm and shade tree crown reduction on soft landscaped ground.
25m Hybrid Spider Lift
Vision 2030 · PIF Giga Projects
We mobilise certified spider lifts, manlifts and scissor lifts to the Public Investment Fund's flagship megaprojects — from NEOM and the Red Sea coast to Diriyah Gate, Qiddiya and SPARK — with ground protection, operator support and rapid cross-country deployment.
NEOM (PIF)
Tabuk Province
Vertical facade and curtain wall access along the 170 km linear city modules, working from narrow podium decks and landscaped terraces with strict floor loading limits.
43m Diesel Spider Lift
Why it matters: Modular facade installation across mirrored modules with non-marking tracks on finished podiums.
NEOM (PIF)
Red Sea Coast
Marina-side hotel facade and beach club structural steel erection, with up-and-over jib access over yacht berths and promenade level.
43m Telescopic Boom Lift
Why it matters: Coastal corrosion-prepped fleet supporting the luxury island resort build-out.
NEOM (PIF)
Tabuk Highlands
Glass and cladding installation on sloped mountain façades where wheeled booms cannot travel, using independent outrigger levelling on gradients.
30m Hybrid Spider Lift
Why it matters: Battery-diesel hybrid power for emission-controlled alpine environment.
Qiddiya Investment Company (PIF)
Riyadh Province
Stadium and entertainment district structural steel erection, façade panel installation and MEP fit-out at height across the sports and culture megaproject.
32m Diesel Boom Lift
Why it matters: Long-term project rental with standby machines protecting the critical path.
DGDA (PIF)
Riyadh Province
Heritage mud-brick wall restoration, feature lighting and signage installation with zero ground damage over sensitive archaeology and finished paving.
21m Battery Spider Lift
Why it matters: Non-marking tracks and battery power preserve the UNESCO-adjacent heritage site.
King Salman Park Foundation (PIF)
Riyadh Province
Canopy and shade structure installation, landscape lighting and irrigation access across the world's largest urban park development.
14m Electric Scissor Lift
Why it matters: Electric machines for emission-free work across landscaped zones.
ROSHN (PIF)
Riyadh Province
Residential façade and balcony installation, MEP first fix and cladding across large-scale mixed-use neighbourhoods.
26m Diesel Boom Lift
Why it matters: Fleet rotation supporting phased handover of thousands of residential units.
Red Sea Global (PIF)
Red Sea Coast (Umluj/Al Wajh)
Luxury resort villa and hotel facade work over coral and mangrove landscapes, with quiet electric operation protecting the sensitive coastal ecology.
16m Electric Spider Manlift
Why it matters: Low-impact battery machines aligned with the regenerative tourism mandate.
Red Sea Global (PIF)
Red Sea Coast
Yacht club and wellness retreat structural steel and glazing, with outreach over water features and infinity pools.
32m Articulated Boom Lift
Why it matters: Knuckle boom up-and-over reach around architectural obstructions.
RCU (PIF)
Madinah Province
Heritage structure maintenance, lighting and signage installation over sandstone tombs and rock formations where ground protection is critical.
25m Hybrid Spider Lift
Why it matters: Spreader plates and load calculations protect the fragile archaeological ground.
SPARK (PIF)
Eastern Province (near Jubail)
Industrial unit cladding, overhead services and warehouse roof access across the energy city's manufacturing and logistics buildings.
16m Diesel Rough Terrain Scissor Lift
Why it matters: Four-wheel-drive rough terrain machines for the graded industrial site.
Jeddah Central Development (PIF)
Makkah Province
Redevelopment of the former Jeddah airport site — façade, steel and MEP access for the stadium, residential and cultural district.
32m Diesel Boom Lift
Why it matters: Large-scale façade packages delivered from our Jeddah depot.
These projects span the Kingdom beyond our three depot cities, so we mobilise with our own low-bed transport, on-site technicians and a documented permit-to-work process. Need a machine on a giga site? Saturday to Thursday, 8:00 AM – 6:00 PM.
Client feedback
We needed a 43m spider lift inside a finished podium at KAFD with strict floor loading limits. Aerial Spider Access Company provided load calculations and delivered within 24 hours. Zero damage, zero delays.
Their electric spider lift let us work in the mall atrium during trading hours without any complaints about noise or fumes. The operator was professional and safety-focused.
During our shutdown at Jubail they kept a standby machine on site for the full 21 days. That decision alone saved us two days on the critical path.
Send us the height and site details — Saturday to Thursday, 8:00 AM – 6:00 PM.
+966 59 253 7255