Spider aerial platform with articulated telescopic boom extended on outriggers beside a glass tower in Riyadh

Projects

Access Equipment Projects Across Saudi Arabia

A selection of the facade, industrial, retail and infrastructure projects our spider lifts, manlifts and scissor lifts have supported in Riyadh, Jeddah and Dammam.

Riyadh Province

Riyadh projects

Recent access equipment scopes delivered from our Riyadh depot.

Spider Lift

KAFD Tower Glass Replacement

Replacement of damaged curtain wall panels at 38m using a tracked spider lift on a podium deck.

43m Diesel Spider Lift

Spider Lift

Diriyah Gate Heritage Lighting

Feature lighting installation over mud-brick heritage walls with zero ground damage.

21m Battery Spider Lift

Scissor Lift

Riyadh Metro Station Fit-Out

Ceiling services and cladding installation across three station boxes.

12m Electric Scissor Lift

Manlift

Logistics Warehouse Roof Steel

Purlin and roof sheeting installation across a 40,000 sqm distribution centre.

26m Diesel Boom Lift

Manlift

Olaya Office Tower Signage

Installation of illuminated corporate signage at 30m above a live plaza.

32m Diesel Boom Lift

Makkah Province

Jeddah projects

Recent access equipment scopes delivered from our Jeddah depot.

Spider Lift

Red Sea Mall Atrium Maintenance

Night-shift atrium cleaning and lighting replacement over polished stone flooring.

16m Electric Spider Manlift

Manlift

Corniche Hotel Facade Painting

External repainting of a 12-storey seafront hotel with jib access over balconies.

43m Telescopic Boom Lift

Scissor Lift

Jeddah Airport Hangar Services

Overhead lighting and fire system maintenance inside an MRO hangar.

14m Electric Scissor Lift

Eastern Province

Dammam projects

Recent access equipment scopes delivered from our Dammam depot.

Spider Lift

Jubail Petrochemical Shutdown

Pipe rack insulation access during a 21-day turnaround with standby units on site.

30m Diesel Spider Lift

Manlift

Ras Tanura Tank Farm Inspection

Shell inspection and coating repair across six storage tanks.

32m Diesel Boom Lift

Scissor Lift

Khobar Retail Fit-Out

MEP first fix and ceiling grid installation for a multi-unit retail block.

10m Electric Scissor Lift

Spider Lift

Dhahran Campus Tree Maintenance

Palm and shade tree crown reduction on soft landscaped ground.

25m Hybrid Spider Lift

Vision 2030 · PIF Giga Projects

Access equipment on Saudi Arabia's giga projects

We mobilise certified spider lifts, manlifts and scissor lifts to the Public Investment Fund's flagship megaprojects — from NEOM and the Red Sea coast to Diriyah Gate, Qiddiya and SPARK — with ground protection, operator support and rapid cross-country deployment.

NEOM (PIF)

NEOM — The Line

Tabuk Province

Vertical facade and curtain wall access along the 170 km linear city modules, working from narrow podium decks and landscaped terraces with strict floor loading limits.

43m Diesel Spider Lift

Why it matters: Modular facade installation across mirrored modules with non-marking tracks on finished podiums.

NEOM (PIF)

Sindalah Island

Red Sea Coast

Marina-side hotel facade and beach club structural steel erection, with up-and-over jib access over yacht berths and promenade level.

43m Telescopic Boom Lift

Why it matters: Coastal corrosion-prepped fleet supporting the luxury island resort build-out.

NEOM (PIF)

Trojena Mountain Resort

Tabuk Highlands

Glass and cladding installation on sloped mountain façades where wheeled booms cannot travel, using independent outrigger levelling on gradients.

30m Hybrid Spider Lift

Why it matters: Battery-diesel hybrid power for emission-controlled alpine environment.

Qiddiya Investment Company (PIF)

Qiddiya City

Riyadh Province

Stadium and entertainment district structural steel erection, façade panel installation and MEP fit-out at height across the sports and culture megaproject.

32m Diesel Boom Lift

Why it matters: Long-term project rental with standby machines protecting the critical path.

DGDA (PIF)

Diriyah Gate

Riyadh Province

Heritage mud-brick wall restoration, feature lighting and signage installation with zero ground damage over sensitive archaeology and finished paving.

21m Battery Spider Lift

Why it matters: Non-marking tracks and battery power preserve the UNESCO-adjacent heritage site.

King Salman Park Foundation (PIF)

King Salman Park

Riyadh Province

Canopy and shade structure installation, landscape lighting and irrigation access across the world's largest urban park development.

14m Electric Scissor Lift

Why it matters: Electric machines for emission-free work across landscaped zones.

ROSHN (PIF)

ROSHN — Yasmir & Sedra

Riyadh Province

Residential façade and balcony installation, MEP first fix and cladding across large-scale mixed-use neighbourhoods.

26m Diesel Boom Lift

Why it matters: Fleet rotation supporting phased handover of thousands of residential units.

Red Sea Global (PIF)

Red Sea Global — Red Sea Project

Red Sea Coast (Umluj/Al Wajh)

Luxury resort villa and hotel facade work over coral and mangrove landscapes, with quiet electric operation protecting the sensitive coastal ecology.

16m Electric Spider Manlift

Why it matters: Low-impact battery machines aligned with the regenerative tourism mandate.

Red Sea Global (PIF)

AMAALA

Red Sea Coast

Yacht club and wellness retreat structural steel and glazing, with outreach over water features and infinity pools.

32m Articulated Boom Lift

Why it matters: Knuckle boom up-and-over reach around architectural obstructions.

RCU (PIF)

AlUla — Royal Commission

Madinah Province

Heritage structure maintenance, lighting and signage installation over sandstone tombs and rock formations where ground protection is critical.

25m Hybrid Spider Lift

Why it matters: Spreader plates and load calculations protect the fragile archaeological ground.

SPARK (PIF)

King Salman Energy Park (SPARK)

Eastern Province (near Jubail)

Industrial unit cladding, overhead services and warehouse roof access across the energy city's manufacturing and logistics buildings.

16m Diesel Rough Terrain Scissor Lift

Why it matters: Four-wheel-drive rough terrain machines for the graded industrial site.

Jeddah Central Development (PIF)

Jeddah Central Project

Makkah Province

Redevelopment of the former Jeddah airport site — façade, steel and MEP access for the stadium, residential and cultural district.

32m Diesel Boom Lift

Why it matters: Large-scale façade packages delivered from our Jeddah depot.

These projects span the Kingdom beyond our three depot cities, so we mobilise with our own low-bed transport, on-site technicians and a documented permit-to-work process. Need a machine on a giga site? Saturday to Thursday, 8:00 AM – 6:00 PM.

Client feedback

Delivered on programme, documented in full

We needed a 43m spider lift inside a finished podium at KAFD with strict floor loading limits. Aerial Spider Access Company provided load calculations and delivered within 24 hours. Zero damage, zero delays.
Abdulaziz Al-HarbiProject Manager, Main ContractorRiyadh
Their electric spider lift let us work in the mall atrium during trading hours without any complaints about noise or fumes. The operator was professional and safety-focused.
Faisal Bin OmarFacilities DirectorJeddah
During our shutdown at Jubail they kept a standby machine on site for the full 21 days. That decision alone saved us two days on the critical path.
Mohammed Al-QahtaniTurnaround CoordinatorDammam

Have a similar scope?

Send us the height and site details — Saturday to Thursday, 8:00 AM – 6:00 PM.

+966 59 253 7255

Call Now WhatsApp